Current time: 07-27-2017, 10:33 PM Hello There, Guest! (LoginRegister)

Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Delay between tests
04-14-2017, 02:39 AM
Post: #1
Delay between tests
Over the last few months, I've seen WPT tests fail when I enable multiple runs. The typical issue is that websites have implemented some kind of rate control to prevent attacks or bad bots. WPT tests are being categorized as something malicious and the requests are blocked.

My suggestion is that WPT should provide an option to introduce delay between multiple test runs. This way, the tests will generally escape the rate limits and continue with the tests.

Please let me know if this sounds feasible.

Follow me on twitter: @rakshay
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Forum Jump:


User(s) browsing this thread: 1 Guest(s)